Decarbonising a fully occupied commercial building without disrupting the people working within it called for careful planning and some intelligent engineering. At One Central Boulevard in Solihull, Prometheus removed the existing gas-fired heating plant and delivered a fully electric building services solution centred around a Mitsubishi four-pipe Air Source Heat Pump system.
The existing air handling units were refurbished with new coils, high-efficiency EC fans and upgraded controls, while electric boilers were introduced to serve the retained VAV reheat system. With the building limited to an existing 1MVA electrical supply, we also developed a bespoke BMS strategy to monitor demand and manage plant operation within the available capacity.
With high-profile tenants including St James’s Place remaining in occupation throughout, close communication, careful sequencing and controlled access were essential. The completed scheme removed reliance on gas-fired plant and provided a fully electrified, low-carbon solution while allowing the building to continue operating throughout the works.