It is difficult to think of many environments where continuity is more important than live broadcasting. Prometheus was appointed to design and deliver the mechanical controls and BMS modifications associated with the remodelling of internal spaces at BBC MediaCityUK, with broadcasting, production and post-production activities continuing throughout the works.
Our team reviewed the existing BMS architecture and developed the controls modifications needed to accommodate revised layouts, thermal loads and zoning arrangements. Existing equipment was retained and optimised wherever practical, with chilled and heating beam groupings reconfigured, control valves validated and temperature and condensation sensors relocated and recommissioned. New controllers were introduced only where required and integrated into the existing BMS network.
Working in such a sensitive live environment required careful interface management and progressive testing, but the completed modifications were commissioned and integrated without interrupting production, post-production or transmission. The result was a responsive controls solution tailored to the BBC’s revised accommodation while making the best possible use of the existing infrastructure.