Manchester Airport, Terminal 2
Manchester Airport - 3 Years On
A project almost 3 years in duration, the PP13 Scheme for Manchester Airport is for the upgrade of the Terminal 2 baggage handling system along with an associated non-baggage scheme. Prometheus was appointed to undertake a range of complex Building Services works consisting of new installations, alongside works to interface with the existing infrastructure.
Elements of new installations include:
- LV panels to supply the new PLC cabinets for the baggage handling system
- LED lighting track installation for both general and emergency
- LED Illuminated emergency exit signage
- DALI control system for all lighting
Elements to interface with existing installations include:
- Rerouting of services to allow for new conveyor systems
- Refurbishment of infrastructure to allow for additional loadings