Princess Square, Bracknell

We completed this project with client Simpsons of York, as part of a full refurbishment of this busy shopping centre. The project involved replacing all mall lighting with state of the art LED fittings, and also replacing and upgrading the fire [...]

2018-12-20T09:05:20+00:00August 12th, 2016|

RLC (UK)

We have a successful long term partnership with RLC (UK), during which time we have delivered the M&E Services for their new factory. We work with them on an ongoing basis adapting existing services and machine layouts as they evolve to [...]

2018-12-20T10:12:17+00:00August 12th, 2016|

M&S Merthyr Tydfil

Prometheus was awarded the contract to supply, install and commission the MEP systems in a new M&S Retail Park store in Merthyr Tydfil. The store consisted of a ground floor sales area and food hall, with a first floor sales area [...]

2018-12-19T16:34:40+00:00August 12th, 2016|

Fulwood Academy

We were very excited to be approached to install a state of the art 3G football pitch for the recently built Fulwood Academy. The result was a superb facility for students and the local community to use, and the school has [...]

2018-12-20T10:39:15+00:00August 12th, 2016|

Lancashire FA

When our long term client Lancashire FA was left in the lurch when his Pitch contractor went into administration, they called on Prometheus to sort it out. Already running behind schedule, with escalating costs, and with match fixtures already set, it [...]

2018-12-20T10:37:05+00:00August 12th, 2016|

Sonoco LED Efficiency

We worked with our long term client Sonoco at their Halifax factory to increase their energy efficiency. We selected the latest generation of Philips Gentlespace LED fittings, which make significant savings and have an expected lifespan of up to 70,000 hours. [...]

2018-12-20T10:36:07+00:00August 11th, 2016|

M&S Luton Roof Pipework Replacement

Our customer asked us to strip out the existing roof heating pipework that had developed leaks due to internal corrosion from lack of inhibitor, and external corrosion as a result of a chemical reaction between the phenolic lagging and carbon steel [...]

2018-12-19T16:50:19+00:00August 11th, 2016|

M&S Leicester Boiler House Replacement

Prometheus installed a brand new boiler system for M&S Leicester. The project presented some challenges, since all M&E services from the existing roof top boiler house had to be removed and access was restricted. Prometheus undertook a safe and successful crane [...]

2018-12-20T10:29:10+00:00August 11th, 2016|

Unilever

We have a long standing relationship with the Unilever team at Port Sunlight, and have undertaken Mechanical and Electrical services on various projects including their R&D facility and refurbishment of the Conference Suite, Director’s Suite and boardrooms. Most recently we have [...]

2018-12-20T10:18:03+00:00August 11th, 2016|

Pure Gym Redditch

Working with Principal Contractor Wilkinsons, we undertook a full M&E fit out for Pure Gym Redditch. Works included installation of new heat pumps, AC & Ventilation, centralised hot water plant, drainage, metering, lighting, power, security,  data and sound system. As a [...]

2018-12-20T10:38:23+00:00August 11th, 2016|