Manchester Airport, Terminal 2

Manchester Airport - 3 Years On

A project almost 3 years in duration, the PP13 Scheme for Manchester Airport is for the upgrade of the Terminal 2 baggage handling system along with an associated non-baggage scheme. Prometheus was appointed to undertake a range of complex Building Services works consisting of new installations, alongside works to interface with the existing infrastructure.

Elements of new installations include:

  • LV panels to supply the new PLC cabinets for the baggage handling system
  • LED lighting track installation for both general and emergency
  • LED Illuminated emergency exit signage
  • DALI control system for all lighting

Elements to interface with existing installations include:

  • Rerouting of services to allow for new conveyor systems
  • Refurbishment of infrastructure to allow for additional loadings